Decking board quantities
Back to calculator ↑Choose board direction first
Decide which way the boards will run before you measure. "Length along boards" is the distance each row covers. "Width across boards" is the distance that rows of boards plus gaps have to fill. If you swap the two, the count changes completely.
Rows, gaps and stock boards
A deck of n rows has n − 1 gaps. Rows are therefore (width + gap) ÷ (board face width + gap), rounded up. Use the finished face width you measured, not the nominal size.
Each row is cut from stock boards. The tool takes a saw cut (3 mm by default) off each cut. A stock board shorter than the row isn't accepted. The tool doesn't plan end joints, so each row has to come from one board.
Worked example
With the defaults (4 m along, 3 m across, 140 mm boards, 5 mm gaps and 4 m stock), 3,005 ÷ 145 = 20.72, so 21 rows. Each row is exactly one 4 m stock board, so you need 21 boards. With 5% allowance it's 22.05, which rounds up to 23 boards. Joists at 0.4 m spacing over 4 m give 11 joists for each board to cross. At 2 screws per crossing, that's 21 × 11 × 2 = 462 screws.
| Board face (3 m across, 5 mm gap) | Rows | Boards + 5% | Screws at 0.4 m joists |
|---|---|---|---|
| 90 mm | 32 | 34 | 704 |
| 140 mm | 21 | 23 | 462 |
| 200 mm | 15 | 16 | 330 |
| 300 mm | 10 | 11 | 220 |
Closer joists mean more screws. At 0.3 m spacing, the same 140 mm deck has 15 joists, so 21 × 15 × 2 = 630 screws. The screw count shown is for the rows themselves. Add your own spares, because screws get dropped and heads strip.
Joist spacing depends on the board you buy
The tool needs a joist spacing to count screws, but that figure isn't a structural recommendation. It's product-specific. Conwood's catalogue says joists for Conwood Deck should be no more than 30 cm apart. Conwood says its newer Deck Core board allows up to 60 cm. Hardwood and WPC makers publish their own span tables. Use the figure from the guide for the exact board you're buying, and enter that spacing. The gap is product-specific too. WPC and fibre-cement boards need room to expand, so use the maker's figure rather than the 5 mm example.
Limits
The tool counts boards and screws only. It doesn't size joists or bearers, or plan posts, footings, end joints, picture-frame edges or fascia boards. For a raised deck people walk on, have the frame checked by a qualified builder or engineer.
Common questions
How many boards for a 4 × 3 m deck with 140 mm boards?
With 5 mm gaps, 21 rows of 4 m boards, or 23 boards with a 5% allowance. If the boards ran the other way, you'd need different rows and stock lengths.
Why won't the tool accept 3 m boards for a 4 m deck?
It doesn't plan end joints. Each row must come from one stock board. For longer decks, calculate each section between joints separately, or buy boards long enough for the whole row.
What gap should I leave between boards?
Use the board maker's figure. Wood, WPC and fibre-cement all move differently with heat and moisture. The 5 mm default is only an example.
What joist spacing do I need?
It depends on the board. Conwood Deck's catalogue says no more than 30 cm. Other boards may allow 40–60 cm. Follow the installation guide, because sagging and cracked boards usually come from joists that are too far apart.
How many screws per board per joist?
Two is common for face-fixed boards. Hidden-clip systems use clips instead. Change the field to match the system, and add spares.
What does the saw-cut setting do?
It takes off the blade width at each cut, so several short rows aren't wrongly fitted into one board. Set it to 0 only if the supplier cuts boards to size.
Can I use this for a deck on a concrete slab?
Yes. Boards and rows work the same way. Some fibre-cement deck boards can be fixed straight to smooth concrete, according to Conwood's manual. Check whether your board needs battens.