Epoxy Flooring Calculator

Measure floor area first, then use the selected coating system’s coverage and combined A+B kit mass.

Use the number of coats in the product system; two is a starting comparison.

Use mixed kg/m² per coat from the product sheet; rough or porous floors may need more.

Use the combined A+B mass of one kit from its label.

More settings (optional)

Allow for material left in the bucket and rough surfaces; start at 10%, then ask the installer.

Epoxy floor coating

Epoxy floor coating
Edit measurements ↑ Measurements and worked example ↓

Your diagram

Was this calculator useful? Feedback

Epoxy floor coating guide

Back to calculator ↑

Measure the floor and coats

Measure the floor in metres and enter the number of coats. Leave out drains, fixed machine bases and anything that won't be coated. For an irregular floor, measure rectangles and add them, or use the area calculator.

Take the number of coats from the actual coating system, not a product photo, and take the consumption per coat and kit weight from the same product's technical data sheet. The starting rate of 0.3 kg/m² per coat is an example for a thin roller-applied coat. Rough or porous concrete uses more than smooth concrete.

How the estimate works

The calculator multiplies area × coats × consumption per coat, adds your allowance, divides by the weight of one complete A+B kit and rounds up.

Worked example: 20 m² × two coats × 0.3 kg/m² = 12 kg of mixed coating. Adding 10% gives 13.2 kg. With 5 kg kits, 13.2 ÷ 5 = 2.64, so you buy three kits. The figures are the combined weight of parts A and B, not litres.

5 kg epoxy kits needed: two coats at 0.3 kg/m² per coat, 10% allowance

5 kg epoxy kits needed: two coats at 0.3 kg/m² per coat, 10% allowance
Floor areaMixed coating needed5 kg kits
10 m²6.6 kg2
20 m²13.2 kg3
30 m²19.8 kg4
40 m²26.4 kg6
50 m²33.0 kg7

Self-levelling and thick-build epoxy systems use far more material per m² than a roller coat, so always use the rate for the system you're buying.

Litres or kilograms

Enter kilograms of mixed material per m² per coat. If the data sheet gives litres per m², multiply by the mixed density from the same sheet. For example, 0.2 L/m² at 1.4 kg/L is 0.28 kg/m². Don't split A and B by eye. If you mix part of a kit, weigh each part in the stated ratio.

Thai garages, shophouses and concrete

Epoxy is popular in Thailand for garages, shophouse ground floors, workshops and warehouses. The concrete has to be ready. Many systems need new concrete to cure for about 28 days, or to reach a stated moisture level, before coating. Ground-floor slabs without a damp-proof layer can push moisture up, which can make the coating blister or peel. Ask the supplier about a moisture test and a primer for damp concrete.

Many epoxies turn yellow and chalky in direct sunlight. For an open carport or outdoor area, ask about a UV-resistant topcoat or a different system. Thai heat also shortens pot life, the time you have to use a mixed kit, so mix only what the team can apply in time, and avoid working in the hottest part of the day.

Check the order

Check each layer's consumption, pot life, recoat time, primer and required film thickness in the system data sheet. Repair cracks and remove oil or old paint first. For a non-slip finish, add the broadcast aggregate as a separate item. Keep the batch numbers in case you need to buy more.

Limits

The estimate covers only the coats you enter. Primer, non-slip aggregate, crack repair, levelling, moisture testing and labour are separate. Real consumption depends on the concrete's porosity and roughness, the application method and what's left in the containers. The 10% allowance is an example and doesn't replace a test area where the manufacturer recommends one.

Common questions

How many kits do I need for a 20 m² garage?

At two coats of 0.3 kg/m² with 10% allowance, you need 13.2 kg, which is three 5 kg kits. A rougher floor or thicker system needs more. Use your product's data sheet rate.

Can I enter litres?

No, enter kilograms of mixed material per m² per coat. Convert litres using the mixed density on the data sheet.

Is primer included?

No. Primer has its own consumption rate and kit size. Calculate it separately, usually as one coat.

How old must new concrete be?

Many systems ask for about 28 days of curing and a maximum moisture level. Follow your product's data sheet and test the moisture if the supplier advises it.

Can I use epoxy outdoors in Thailand?

Many epoxies yellow and chalk in strong sun. For outdoor or sunny areas, ask about a UV-resistant topcoat or a different system.

Why buy whole kits?

Two-part products are sold as matched A+B kits in a fixed ratio. Splitting them without weighing can stop the coating curing properly.

Sources and calculation guidance